IMG_0023-Edit (1)

T2 Westfield

The Westfield Terminal 2 at LAX Airport was a two-phase project that comprised of renovating and upgrading the look and feel of the terminal.

The Westfield Terminal 2 at LAX Airport project entailed renovating and upgrading the look and feel of the Terminal 2 Concourse with a design that was dynamic, visually appealing, and unexpected in an airport environment. Construction occurred over an 18-month period and the airport remained operational 24/7, requiring successful coordination between the Owner, other airlines, government agencies, the airport, and the City of Los Angeles. The combined efforts of these entities minimized operational impacts and maintained a positive passenger experience during construction. Highlights of the program included:
- Renovation and expansion of food and beverage and retail locations
- Finish and furniture upgrades to hold-rooms that included carpet and cluster seating

Source: www.henselphelps.com
RELATED VIDEO
Gurston Down T2 run 20th April 2013 - Westfield 2.0l Zetec
Gurston Down T2 run 20th April 2013 - Westfield 2.0l Zetec ...
Curborough 2013 T2 run Westfield 2.0l Zetec - 250bhp
Curborough 2013 T2 run Westfield 2.0l Zetec - 250bhp
RELATED FACTS
Share this Post

Related posts

Loose leaf tea brewer

Loose leaf tea brewer

NOVEMBER 12, 2019

Preparing the perfect cup of tea is a process to be savored. Watch how the traditional elements harmoniously come together…

Read More
Organic loose leaf Teas

Organic loose leaf Teas

NOVEMBER 12, 2019

Any tea devotee knows that that not all teas are created equal. Realizing this, we at Arbor Teas perform extensive comparative…

Read More